ACM logo
Project Quality ControlACM Pty Ltd · Inspection & scope management
Engineering quality management

Project inspection workspace

Manage customer details, drawing requirements, ACM scope, quantities and inspection evidence. All entries are editable and require engineering review.

Cloud-ready V2: Project records and original drawings can be saved to Cloudflare D1 + R2 after backend setup. Cloudflare Access protection is REQUIRED before use. Until connected, this app works locally only.

Saved projects & cloud storage

Checking connection…

When an SO is raised: enter the job number and PO, upload drawings, then Save to Cloud. When manufacturing finishes: open the saved job and complete QC.

Project and customer details

Separate the organisation named on the drawing, the end customer and the business that placed ACM's order.

Upload drawings or BOM

Upload PDF, TXT, CSV, STEP, STP, DXF or ZIP. With Cloudflare configured, originals are stored in private R2 storage under the saved project. PDF selectable text can be reviewed locally; scanned drawings and logos are not automatically recognised.

No drawing text extracted yet.
Drawing quantities, part numbers, dimensions, GD&T, finishes and logo-based company identification must be verified against the source drawings. No automatic QC approval.

Drawing requirements / notes

Requirement / drawing noteApplicabilityAction

Parts, scope and quantities

Drawing quantity and ACM order quantity can differ. Out-of-scope items stay visible for traceability and do not count towards required production quantities.

Part no.DescriptionDrawing qtyACM order qtyManufacturedAcceptedScopeNotes / exclusion reason

General manufacturing QC

Mark N/A for checks that do not apply, including operations excluded from ACM's scope. For dimensional checks, record actual readings and verify against the drawing.

CheckResultMeasured / evidenceComments / N/A reason

Final disposition

Inspection report preview

Review all details before issuing. The printable report includes parts, quantities, scope exclusions, drawing notes, QC results and sign-off.